
Privacy
Atlantic | |
---|---|
State | Nova Scotia |
Country | Canada |
Capital | |
Population | 0 |
Postcode | B0T 1W0 |
The Atlantic Ocean is the second-largest of the world's oceans, with an area of about 106,460,000 km2 (41,100,000 sq mi). It covers approximately 20 percent of Earth's surface and about 29 percent of its water surface area. It is known to separate the "Old World" from the "New World" in the European perception of the World.
The Atlantic Ocean occupies an elongated, S-shaped basin extending longitudinally between Europe and Africa to the east, and the Americas to the west. As one component of the interconnected World Ocean, it is connected in the north to the Arctic Ocean, to the Pacific Ocean in the southwest, the Indian Ocean in the southeast, and the Southern Ocean in the south (other definitions describe the Atlantic as extending southward to Antarctica).
Hetauda Sub Metropolitan | |
---|---|
State | |
Country | |
Capital | |
Population | 0 |
Hetauda (Nepali: हेटौडा, pronounced [heˈʈʌu̯ɽa]) is a sub-metropolitan city in the Makwanpur District of Bagmati Province in central Nepal. It is the administrative headquarters of the Makwanpur District and the capital of Bagmati Province as declared by majority (105 out of 110) Provincial Assembly Members on 12 January 2020. It is one of the largest cities of Nepal. At the time of the 2015 Nepal census, it had a population of 153,875 people. The city had a population of 195,951 in 2021.Hetauda sub-metropolitan city is situated in the confluence of the two prominent national highways viz. Tribhuvan highway and Mahendra highway. It was declared a municipality in 1969 A.D (2026 B.S), but development was sluggish. Momentum increased when the city became headquarters of the Makwanpur district in 1982A.D (2039 B.S). It is regarded as a "Green city" because the city has planted trees on either sides of the road.
Hetauda is located at a distance of 76 km from the capital city, Kathmandu, via the fast track, at a distance of 132 km via Daman, Tribhuvan Highway and 224 km via Narayangadh. Another Kanti Lokpath highway will be built within May 2018, and it will take only 2 hours to travel from Hetauda to Kathmandu. Also, the first road tunnel is being constructed which is believed to shorten the distance between Hetauda and Kathmandu. It is expected that traveling time from Kathmandu to Hetauda via the road tunnel will be just 57 min and 13 sec only.